Paste your sites and their supplies. Get every supply point classified.
Paste your list of sites and their energy supplies. Get every supply point classified: what it is metered by, what it pays under, what it can and cannot report under the carbon and energy rules that apply to you, which sites can take part in demand response and storage programmes and which cannot, the contracts ending inside a year, and the questions to take to your energy manager and your auditor before the next reporting period.

| Supply point | Supply and meter | Tariff | kWh |
|---|---|---|---|
| 01 Head office Sydney green tariff, no instrumentcontract inside twelve months | grid electricity interval | green tariff, no certificate named | 640,000 |
| 10 Store 214 Hamilton duplicatecontract inside twelve months | gas accumulation | fixed | 96,000 |
| 17 Truganina distribution centre no sub-meteringno baseline | grid electricity interval | demand charge pays | 4,200,000 |
| 18 Cold store Truganina no sub-meteringno baseline | grid electricity interval | demand charge pays | 5,100,000 |
| 23 Depot Rotorua no export arrangement | solar PV 250 kW sub-metered | not stated | 310,000 |
| 24 Data room Auckland unmetered | diesel or standby generation unmetered | not stated | not read |
| 26 Clinic Frankston accumulation where interval neededcontract inside twelve months | grid electricity accumulation | fixed | 48,000 |
| 28 supply points, 23 sites | 13 interval | 8 that pay | 23,850,500 |
What the register reads off each line
kWh, as pastedThe supply point, placed
Each line is matched against thirty published site classes in six families and eight supply types, longest match wins. The class says whether the site normally carries a load that can be shed or shifted; the supply says which category of the inventory it lands in and whether it is imported energy or the site's own generation or storage. A line no class or supply matches is marked unrecognised and given the three questions that place it.
The meter, the tariff, the kWh
Four meter types and eight tariff types are read from the words on the line. An interval meter supports an interval-data programme and a location-based inventory; an accumulation meter supports neither. A time-of-use, demand-charge or pass-through tariff pays for flexibility; a fixed or flat tariff does not. The kWh figure is kept as pasted, in its meter window, and every share is a share of the kWh read.
The duty, quoted, and the finding named
For every classified line the ticked regimes attach their clauses: ISO 50001 on metering, the energy review, the baseline and procurement; ISO 14064-1 on boundaries, categories, quantification and the market-based conditions for imported electricity; AASB S2 on the scope 2 disclosure; ISO 22301 where standby generation or storage is a site's continuity measure. A finding is a metering, tariff or reporting expectation the published text sets, named with the clause; it is not a ruling on the site, the supplier or the tariff.
Why a register and not a spreadsheet
The spreadsheet holds the sites, the meters and the contracts. What it does not hold is the reading: which lines can take part in a programme, which reported figure the meter and the tariff can support, which contract ends before the reporting period, and which clause an auditor will open first. The register is that reading, made from your own rows, in your browser, in one morning.
Energy Register: the questions buyers ask
What is Energy Register?
Energy Register takes your list of sites and their energy supplies and classifies every supply point. Per supply point it returns what it is metered by, what it pays under, and what it can and cannot report under the rules that apply to you.
What do I paste into Energy Register?
One supply point per line, with the site, country, supply, meter, tariff and annual kWh, and where you have them the supplier, contract end, generation, storage, EV charging and owner. A header row, pipes, tabs, commas or a facilities register export all work, and a site may appear on several lines, one per supply.
How many supply points can I run for free?
Eight supply points are free and no sign-in is needed. Nothing you paste leaves the page unless you save it.
How does it read the meter?
It reads four meter types from the words on the line. An interval meter supports an interval-data programme and a location-based inventory, while an accumulation meter supports neither.
How does the tariff affect what a site can do?
Eight tariff types are read from the line. A time-of-use, demand-charge or pass-through tariff pays for flexibility, while a fixed or flat tariff does not.
How does it decide whether a site can join a demand response or storage programme?
Programme eligibility is read from three facts on the line (the meter, the class and the tariff) and the country's named programme. The register says can take part only where all four hold, and otherwise names the one condition that stops it.
Which regimes does it attach?
ISO 50001 on metering, the energy review, the baseline and procurement; ISO 14064-1 on boundaries, categories, quantification and the market-based conditions for imported electricity; AASB S2 on the scope 2 disclosure; and ISO 22301 where standby generation or storage is a site's continuity measure. With nothing ticked it reads as ISO 50001 and ISO 14064-1, and a preamble line ticks the rest for you.
Does it compute my emissions figure?
No. It never computes an emissions figure; it works in kWh only and cites the clause that says how a figure would be made. The GHG Protocol, the CSRD, the EPBD and the SEC climate rule are quoted as named references by supply and country.
What does it tell me about my energy contracts?
It flags the contracts ending inside a year, so you can raise them before the next reporting period. The specimen marks the supply points that carry a contract inside twelve months.
What is a finding in Energy Register?
A finding is a metering, tariff or reporting expectation the published text sets, named with the clause. It is not a ruling on the site, the supplier or the tariff.
What do I take to my energy manager and auditor?
The questions to take to your energy manager and your auditor before the next reporting period, and the classified list of supply points with the clause behind each answer. You can set a reporting owner and pin the date with a preamble line such as `iso 50001: yes | aasb s2: yes | reporting owner: Priya Natarajan | as at: 2026-09-22`.
Does it grade a site, a supplier or a tariff?
No. It is a reading of your own lines and a statement of the duty in our words, cited to its clause; it does not grade a site, a supplier or a tariff.
How Energy Register compares with a spreadsheet, an energy manager or a general assistant
A spreadsheet holds the sites and the kWh, and its sums are as good as anyone's, but it does not read a meter type or a tariff into what a supply point can report or whether it can take part in a demand response or storage programme. An energy manager or an energy consultant already knows the tariffs and the contracts and can act on them, and an auditor or a lawyer can decide how a figure is disclosed; this register never computes an emissions figure and does not grade a site, a supplier or a tariff. A general AI assistant will explain scope 2 in plain language, but it will not attach the clauses of ISO 50001, ISO 14064-1, ISO 14001, AASB S2 or ISO 22301 to each pasted supply point. Energy Register classifies every supply point, reads the meter, the tariff and the kWh, names which lines can take part in a programme and which one condition stops the rest, flags the contracts ending inside a year, and gives the questions to take to your energy manager and your auditor, from the list you already keep.
Primary source: ISO 50001:2018