Attaches to every supply point: the scope that excludes no energy type, the energy review and its significant energy uses, the data collection plan and the monitoring minimum on every line, the baseline on the top-band sites, procurement on every contract and design on every generation or storage asset. With nothing ticked these rows render as the default.

On the register, tick "ISO 50001:2018" and these rows appear on every supply point. Source framework: ISO 50001:2018, energy management systems.

How the duties attach

ReachesEvery supply point.
every supply point4.3, 6.3, 6.6, 9.1.1
grid electricity6.4, 8.3
gas8.3
solar PV8.2
battery storage8.1, 8.2
EV charging8.1
diesel or standby generation9.1.1
district heat or cooling8.3
CHP8.1, 8.2
interval meter6.4
accumulation meter6.6
sub-metered meter6.3
unmetered meter6.6
fixed tariff8.3
time-of-use tariff6.2
demand charge tariff6.2
pass-through tariff6.2
green tariff, certificates named tariff8.3
green tariff, no certificate named tariff8.3
export tariff8.2
flat tariff8.3
office and head office6.2
retail unit, branch and hospitality6.2
warehouse, distribution centre, cold store and depot8.1
plant, bakery, workshop and laboratory8.1, 8.2
clinic, hospital, campus and school building8.1
car park, data room, plant room and unattended asset6.6
top-band site6.2, 6.5
high-band site6.5
contract ending inside twelve months8.2, 8.3
the register as a whole9.1.2, 9.3, 10.1

The metering minimum

Clause 9.1.1 is the row every line carries: energy performance and the EnMS monitored, measured, analysed and evaluated at planned intervals, with the significant energy uses, the relevant variables, the indicators, the effectiveness of the action plans and the consumption against the expected figure among the items monitored. Clause 6.6 names each meter in the data collection plan and asks that the measuring equipment be accurate and repeatable. An accumulation meter meets the minimum; an interval meter is what the significant energy uses and any programme need, which is why the finding names the lines where the two disagree.

The clauses, quoted

13 of 29 in the framework

Requirement text quoted from the standards themselves, published at compliance.theartofservice.com, the same publisher as this register, read against the held text of each standard: our statement of each clause, not the instrument verbatim.

ISO 50001 4.3 Determining the scope of the energy management system

Determine the boundaries and applicability of the EnMS, considering the issues of 4.1 and the requirements of 4.2; ensure authority to control energy efficiency, use and consumption within the scope and boundaries; do not exclude any energy type within them; maintain the scope and boundaries as documented information.

Evidence an auditor accepts: Documented EnMS scope and boundaries
Common gap: An energy type excluded from the scope
Framework page: ISO 50001:2018
ISO 50001 6.2 Objectives, energy targets and planning to achieve them

Establish objectives at relevant functions and levels and establish energy targets (6.2.1). Objectives and energy targets shall be consistent with the energy policy, measurable if practicable, take account of applicable requirements, consider the SEUs and the opportunities from the energy review, and be monitored, communicated and updated as appropriate; retain documented information on them (6.2.2). Establish and maintain action plans stating what will be done, the resources required, who is responsible, when it will be completed and how results will be evaluated including the methods used to verify energy performance improvement; consider how the actions integrate into business processes; retain documented information on the action plans (6.2.3).

Evidence an auditor accepts: Documented objectives and energy targets; Action plans with the five required elements and verification methods
Common gap: Targets that ignore the SEUs
Framework page: ISO 50001:2018
ISO 50001 6.3 Energy review

Develop and conduct an energy review: analyse energy use and consumption from measurement and other data, identifying current energy types and evaluating past and current energy uses and consumption; identify the significant energy uses (SEUs); for each SEU determine relevant variables, determine current energy performance and identify the persons under the organization's control who influence or affect it; determine and prioritize opportunities for improving energy performance; and estimate future energy use and consumption. Update the review at defined intervals and after major changes to facilities, equipment, systems or energy-using processes; maintain the methods and criteria as documented information and retain its results.

Evidence an auditor accepts: Energy review with data analysis, SEU list, relevant variables, opportunities and future estimate; Documented methods and criteria
Common gap: SEUs chosen without a documented significance criterion
Framework page: ISO 50001:2018
ISO 50001 6.4 Energy performance indicators

Determine EnPIs that are appropriate for measuring and monitoring energy performance and enable the organization to demonstrate energy performance improvement; maintain the method for determining and updating them as documented information; where data show that relevant variables significantly affect energy performance, consider that data in establishing the EnPIs; review EnPI values and compare them to the corresponding EnBs; retain documented information of EnPI values.

Evidence an auditor accepts: Documented EnPI method and EnPI values with comparison to baselines
Common gap: EnPIs that cannot show improvement (absolute consumption with no normalization)
Framework page: ISO 50001:2018
ISO 50001 6.5 Energy baseline

Establish one or more EnBs using the information from the energy review over a suitable period; where data show that relevant variables significantly affect energy performance, normalize the EnPI values and the corresponding EnBs; revise the EnBs when the EnPIs no longer reflect energy performance, when there have been major changes to the static factors, or according to a pre-determined method; retain the EnBs, relevant variable data and modifications as documented information.

Evidence an auditor accepts: Documented EnBs with period, normalization and revision history
Common gap: Baseline never revised after a major static-factor change
Framework page: ISO 50001:2018
ISO 50001 6.6 Planning for collection of energy data

Ensure the key characteristics of operations affecting energy performance are identified, measured, monitored and analysed at planned intervals; define and implement an energy data collection plan appropriate to size, complexity, resources and measurement equipment, specifying the data needed to monitor the key characteristics and how and how often they are collected and retained, including the relevant variables for SEUs, energy consumption related to SEUs and the organization, operational criteria for SEUs, static factors and the data specified in action plans; review and update the plan at defined intervals; ensure measurement equipment gives accurate and repeatable data and retain documented information on the means of establishing accuracy and repeatability.

Evidence an auditor accepts: Energy data collection plan with the five data classes; Calibration or verification records for measurement equipment
Common gap: Data plan that omits static factors
Framework page: ISO 50001:2018
ISO 50001 8.1 Operational planning and control

Plan, implement and control the processes related to the SEUs that are needed to meet requirements and implement the actions of 6.2, by establishing criteria for the processes including effective operation and maintenance of facilities, equipment, systems and energy-using processes where their absence can lead to a significant deviation from intended energy performance; communicating the criteria to the relevant persons; implementing control in accordance with the criteria; and keeping documented information to have confidence the processes were carried out as planned. Control planned changes and review the consequences of unintended changes, mitigating adverse effects; ensure outsourced SEUs or processes related to SEUs are controlled.

Evidence an auditor accepts: Operating and maintenance criteria for SEUs; Change control records; Controls over outsourced SEUs
Common gap: Maintenance of SEU equipment left to a general schedule with no energy criteria
Framework page: ISO 50001:2018
ISO 50001 8.2 Design

Consider energy performance improvement opportunities and operational control in the design of new, modified and renovated facilities, equipment, systems and energy-using processes that can significantly impact energy performance over their planned or expected operating lifetime; where applicable incorporate the results into specification, design and procurement activities; retain documented information of design activities related to energy performance.

Evidence an auditor accepts: Design reviews recording energy performance consideration over the lifetime
Common gap: Energy performance considered after the design is fixed
Framework page: ISO 50001:2018
ISO 50001 8.3 Procurement

Establish and implement criteria for evaluating energy performance over the planned or expected operating lifetime when procuring energy-using products, equipment and services expected to have a significant impact on energy performance; when procuring products, equipment and services that have or can have an impact on SEUs, inform suppliers that energy performance is one of the evaluation criteria; where applicable define and communicate specifications for ensuring the energy performance of procured equipment and services and for the purchase of energy.

Evidence an auditor accepts: Procurement criteria for lifetime energy performance; Supplier notifications; Energy purchase specifications
Common gap: Equipment bought on capital cost with no lifetime energy evaluation
Framework page: ISO 50001:2018
ISO 50001 9.1.1 General

Determine for energy performance and the EnMS what needs to be monitored and measured, including at a minimum the effectiveness of action plans in achieving objectives and energy targets, the EnPIs, the operation of SEUs and actual versus expected energy consumption; the methods to ensure valid results; when monitoring and measurement are performed; and when the results are analysed and evaluated. Evaluate energy performance and EnMS effectiveness; evaluate energy performance improvement by comparing EnPI values against the corresponding EnBs; investigate and respond to significant deviations in energy performance and retain documented information of the investigation and response; retain documented information on monitoring and measurement results.

Evidence an auditor accepts: Monitoring records for the four key characteristics; EnPI versus EnB evaluations; Significant deviation investigations
Common gap: Actual versus expected consumption never compared
Framework page: ISO 50001:2018
ISO 50001 9.1.2 Evaluation of compliance with legal requirements and other requirements

At planned intervals evaluate compliance with the legal and other requirements related to energy efficiency, energy use, energy consumption and the EnMS; retain documented information on the results and any actions taken.

Evidence an auditor accepts: Compliance evaluation records with actions
Common gap: Legal register maintained but compliance never evaluated
Framework page: ISO 50001:2018
ISO 50001 9.3 Management review

Top management shall review the EnMS at planned intervals for continuing suitability, adequacy, effectiveness and alignment with strategic direction (9.3.1), considering the status of previous actions, changes in external and internal issues and related risks and opportunities, EnMS performance including trends in nonconformities and corrective actions, monitoring and measurement results, audit results and compliance evaluation results, opportunities for continual improvement including competence, and the energy policy (9.3.2); the energy performance inputs shall include the extent to which objectives and energy targets are met, energy performance and its improvement from monitoring and measurement including the EnPIs, and the status of action plans (9.3.3). Outputs shall include decisions on continual improvement opportunities and any need to change the EnMS: opportunities to improve energy performance, the energy policy, the EnPIs or EnBs, objectives, targets, action plans or other elements and actions where they are not achieved, integration with business processes, resource allocation, and improvement of competence, awareness and communication; retain documented information of the results (9.3.4).

Evidence an auditor accepts: Management review records with the required inputs, energy performance inputs and outputs
Common gap: Review without EnPI trend or action plan status
Framework page: ISO 50001:2018
ISO 50001 10.1 Nonconformity and corrective action

When a nonconformity is identified: react to it, taking action to control and correct it and dealing with the consequences; evaluate the need for action to eliminate its causes so it does not recur or occur elsewhere, by reviewing it, determining its causes and determining whether similar nonconformities exist or could occur; implement any action needed; review the effectiveness of corrective action; and change the EnMS if necessary. Corrective actions shall be appropriate to the effects of the nonconformities; retain documented information of the nature of nonconformities, actions taken and the results of corrective action.

Evidence an auditor accepts: Nonconformity and corrective action records with cause and effectiveness review
Common gap: Corrections logged with no cause analysis
Framework page: ISO 50001:2018