Export
A price paid for electricity the site exports: a feed-in rate, net metering, an export agreement. It pays for generation, not for flexibility, and it is the arrangement a solar or CHP line must name before the export can be shown separately in the inventory.
How the register reads it
| Pays for flexibility | does not pay: the tariff charges the same at every hour, so a line on it reads tariff does not pay however controllable the load; the contract end date is the moment that changes. |
|---|---|
| Market-based figure | An export arrangement covers electricity leaving the site; exported generation is shown separately in the inventory and never deducted from the site's own figure. |
What each regime attaches to this tariff
| ISO 50001 | ISO 50001 8.2 |
|---|---|
| ISO 14064-1 | ISO 14064-1 part 1, E.3 |
Requirement text quoted from the standards themselves, published at compliance.theartofservice.com, the same publisher as this register, read against the held text of each standard: our statement of each clause, not the instrument verbatim.
ISO 14064-1 part 1, E.3 E.3 Treatment of exported electricityDirect emissions from electricity generated and exported or distributed by the organization may be reported separately but shall not be deducted from the organization's total direct emissions.
Common gap: Exported electricity deducted from direct emissions
Framework page: ISO 14064-1:2018
ISO 50001 8.2 DesignConsider energy performance improvement opportunities and operational control in the design of new, modified and renovated facilities, equipment, systems and energy-using processes that can significantly impact energy performance over their planned or expected operating lifetime; where applicable incorporate the results into specification, design and procurement activities; retain documented information of design activities related to energy performance.
Common gap: Energy performance considered after the design is fixed
Framework page: ISO 50001:2018
Register every supply point on it
Paste the list; every line on this tariff reads pays or does not pay beside its meter, and the contract end sits in its own column. Eight supply points free, no account.
Build my energy register