Energy Register
Every country ยท European Union

France

CSRD sustainability reporting (ESRS E1, in our words) and the recast Energy Performance of Buildings Directive (in our words), with the Energy Efficiency Directive's energy audit duty named only.

How the register reads a supply point here

Code and aliasesFR: paris, lyon, marseille
SchemeCSRD sustainability reporting (ESRS E1, in our words) and the recast Energy Performance of Buildings Directive (in our words), with the Energy Efficiency Directive's energy audit duty named only. Mandatory for operators of some size: a line here with no reporting owner raises the finding.
Text quotedThe CSRD (Directive (EU) 2022/2464) and ESRS requirements are stated in our words on the lines in this country: CSRD Art. 19a(4), CSRD E1-CC, EPBD Art. 9, EPBD Art. 13, EPBD Art. 14, EPBD Art. 16, EPBD Art. 19, 20, 21, 22, EPBD Art. 23, 24.
Demand responseProgramme named: national demand response and flexibility markets run through the transmission operator and aggregators. A line here reads can take part where the meter, the class and the tariff allow.

Requirement text is our own statement of each clause, from the standards published at compliance.theartofservice.com, the same publisher as this register, read against the published text of each standard: our statement of each clause, not the instrument verbatim.

CSRD Art. 19a(4) Report in accordance with the European Sustainability Reporting Standards

The information must be prepared in line with the sustainability reporting standards adopted by the Commission under Article 29b (the ESRS). Those standards set what is reported and its structure, must make the information understandable, relevant, verifiable, comparable and faithful, favour quantitative data where feasible and must not require reporting und...

Evidence an auditor accepts: Statement of compliance with the ESRS set applicable to the year, naming the delegated regulation; ESRS disclosure requirement index mapping each material disclosure to its location; Transition note where the revised ESRS replace the first set
Common gap: Statement prepared against GRI or other frameworks without ESRS compliance
Framework page: CSRD (Directive (EU) 2022/2464) and ESRS
CSRD E1-CC Climate transition plan compatible with limiting warming to 1.5 C and climate neutrality by 2050

The statement must describe the undertaking's plans, including implementing actions and the related financial and investment plans, to make its business model and strategy compatible with the transition to a sustainable economy, with limiting global warming to 1.5 C under the Paris Agreement and with the Union's 2050 climate neutrality objective, and, where ...

Evidence an auditor accepts: Board-approved transition plan with decarbonisation levers, milestones and capital and operating expenditure allocated; Disclosure of exposure to coal, oil and gas activities where relevant; Reconciliation of the plan's investment figures to the financial plan or budget
Common gap: Plan stated as ambition only, without actions or financing
Framework page: CSRD (Directive (EU) 2022/2464) and ESRS
EPBD Art. 9 Minimum Energy Performance Standards for non-residential and trajectories for residential (Article 9)

Article 9 introduces MEPS for non-residential buildings: Member States establish maximum energy-performance thresholds, with the existing non-residential stock above the 16% worst performing buildings to be brought below that threshold by 2030, and the 26% worst-performing threshold by 2033. Article 9(3) requires Member States to set national trajectories fo...

Evidence an auditor accepts: Asset-level MEPS-compliance roadmap (non-residential >=16% threshold by 2030, >=26% by 2033); Residential portfolio decarbonisation trajectory aligned with the Member State Article 9(3) plan
Common gap: Non-residential portfolio with assets in the worst-performing 16% lacking a 2030 plan
Framework page: EPBD recast (Directive (EU) 2024/1275)
EPBD Art. 13 Technical building systems (Article 13)

Article 13 requires Member States to set system requirements in relation to the overall energy performance, the proper installation, and the appropriate dimensioning, adjustment and control of the technical building systems (TBS) installed in existing buildings, namely heating, hot water, cooling, ventilation, large built-in lighting, building automation and...

Evidence an auditor accepts: BACS deployment calendar aligned with Article 13(8) (290 kW by 2024) and Article 13(8)(b) (70 kW by 2029); TBS conformity records at installation + system reset / commissioning
Common gap: Eligible non-residential building above 290 kW HVAC output without BACS by 31 Dec 2024
Framework page: EPBD recast (Directive (EU) 2024/1275)
EPBD Art. 14 Infrastructure for sustainable mobility (Article 14)

Article 14 requires Member States to ensure the installation of electric-vehicle (EV) recharging points and bicycle parking spaces in non-residential and residential buildings. Non-residential: new and major renovation with more than 5 car parking spaces: at least 1 recharging point per 5 spaces + bicycle parking; existing non-residential with more than 20 c...

Evidence an auditor accepts: Project-level Article 14 design records for new + major-renovation buildings; Existing-non-residential 20+ space buildings retrofit plan for 1 Jan 2027 deadline; Public-sector heightened requirements applied where relevant
Common gap: New building over 5 non-residential parking spaces without EV recharging point
Framework page: EPBD recast (Directive (EU) 2024/1275)
EPBD Art. 16 Data exchange (Article 16)

Article 16 requires Member States to ensure that building owners, tenants and managers can have direct access to their building data via a single secure access point, including data from the technical building systems (Article 13), the EPC databases (Article 22), the renovation passport (Article 12) and any related metering / sub-metering data. Data sharing ...

Evidence an auditor accepts: Single secure access point for building data integrated with TBS / EPC / passport / metering; Data-sharing terms aligned with GDPR (personal data) + Data Act (non-personal)
Common gap: TBS data locked behind proprietary interfaces without owner / tenant / manager access
Framework page: EPBD recast (Directive (EU) 2024/1275)
EPBD Art. 19, 20, 21, 22 Energy Performance Certificates (Articles 19-22)

Article 19 requires the issue of EPCs in defined cases: construction, sale, new lease (Article 19), with the EPC class shown in property advertisements. Article 19(7) requires Member States to introduce, by 29 May 2026, an A+++ to G scale (where A+++ corresponds to ZEB; A to NZEB; G is the worst performing 15% of national stock). Article 20 governs the issue...

Evidence an auditor accepts: EPC issue records (construction / sale / lease); EPC class in property advertisements + sale-particulars; Display of valid EPC where Article 21 applies
Common gap: Sale or new lease without a valid EPC
Framework page: EPBD recast (Directive (EU) 2024/1275)
EPBD Art. 23, 24 Inspections of heating, ventilation and air-conditioning systems (Articles 23-24)

Article 23 requires regular inspections of accessible parts of HVAC systems above defined kW thresholds (heating + combined heating-and-ventilation above 70 kW; air-conditioning + combined air-conditioning-and-ventilation above 70 kW). Inspection covers the efficiency and dimensioning of the system. Article 24 requires inspection reports made available to th...

Evidence an auditor accepts: Inspection-cycle calendar for HVAC systems above 70 kW; Inspection reports retained and made available to the building owner
Common gap: HVAC system above 70 kW lacking inspection records on schedule
Framework page: EPBD recast (Directive (EU) 2024/1275)

Register the supply points in France

Paste the list with the country on each line; every line here carries the scheme, the programme reading and, where the page states it, the clause. Eight supply points free, no account.

Build my energy register