Energy Register

Solar PV

Generation on site: not an imported supply and not a direct emission. What matters for the inventory is the export: electricity generated and exported is shown separately and never deducted from the site's own figure (Annex E.3), and generation consumed on site reduces the imported kWh, not the reported factor.

How the register reads it

Categoryown generation Generation on site: not an imported supply and not a direct emission.
Reportable as imported energyNo: the site's own generation or storage carries no category of its own; consumed on site it reduces the imported kWh, and any export is shown separately and never deducted.
Electrical loadYes: a demand response programme can settle it where the meter, the tariff and the class allow.
Classes that typically carry itDepot, Distribution centre, Warehouse, Packing plant, Plant, Campus, School, Car park, Pumping station

What each regime attaches to this supply

ISO 50001ISO 50001 8.2
ISO 14064-1ISO 14064-1 part 1, E.3
Named referencesEPBD Art. 13

Requirement text quoted from the standards themselves, published at compliance.theartofservice.com, the same publisher as this register, read against the held text of each standard: our statement of each clause, not the instrument verbatim.

ISO 14064-1 part 1, E.3 E.3 Treatment of exported electricity

Direct emissions from electricity generated and exported or distributed by the organization may be reported separately but shall not be deducted from the organization's total direct emissions.

Evidence an auditor accepts: Exported generation shown separately, not deducted
Common gap: Exported electricity deducted from direct emissions
Framework page: ISO 14064-1:2018
ISO 50001 8.2 Design

Consider energy performance improvement opportunities and operational control in the design of new, modified and renovated facilities, equipment, systems and energy-using processes that can significantly impact energy performance over their planned or expected operating lifetime; where applicable incorporate the results into specification, design and procurement activities; retain documented information of design activities related to energy performance.

Evidence an auditor accepts: Design reviews recording energy performance consideration over the lifetime
Common gap: Energy performance considered after the design is fixed
Framework page: ISO 50001:2018

Register every supply point that carries it

Paste the list; every line of this supply carries these rows beside its meter, its tariff and its kWh. Eight supply points free, no account.

Build my energy register