Solar PV
Generation on site: not an imported supply and not a direct emission. What matters for the inventory is the export: electricity generated and exported is shown separately and never deducted from the site's own figure (Annex E.3), and generation consumed on site reduces the imported kWh, not the reported factor.
How the register reads it
| Category | own generation Generation on site: not an imported supply and not a direct emission. |
|---|---|
| Reportable as imported energy | No: the site's own generation or storage carries no category of its own; consumed on site it reduces the imported kWh, and any export is shown separately and never deducted. |
| Electrical load | Yes: a demand response programme can settle it where the meter, the tariff and the class allow. |
| Classes that typically carry it | Depot, Distribution centre, Warehouse, Packing plant, Plant, Campus, School, Car park, Pumping station |
What each regime attaches to this supply
| ISO 50001 | ISO 50001 8.2 |
|---|---|
| ISO 14064-1 | ISO 14064-1 part 1, E.3 |
| Named references | EPBD Art. 13 |
Requirement text quoted from the standards themselves, published at compliance.theartofservice.com, the same publisher as this register, read against the held text of each standard: our statement of each clause, not the instrument verbatim.
ISO 14064-1 part 1, E.3 E.3 Treatment of exported electricityDirect emissions from electricity generated and exported or distributed by the organization may be reported separately but shall not be deducted from the organization's total direct emissions.
Common gap: Exported electricity deducted from direct emissions
Framework page: ISO 14064-1:2018
ISO 50001 8.2 DesignConsider energy performance improvement opportunities and operational control in the design of new, modified and renovated facilities, equipment, systems and energy-using processes that can significantly impact energy performance over their planned or expected operating lifetime; where applicable incorporate the results into specification, design and procurement activities; retain documented information of design activities related to energy performance.
Common gap: Energy performance considered after the design is fixed
Framework page: ISO 50001:2018
Register every supply point that carries it
Paste the list; every line of this supply carries these rows beside its meter, its tariff and its kWh. Eight supply points free, no account.
Build my energy register